Case study on a 15-ton steel mill crane with C-Hook, showcasing project update, video feedback, and mill operations.Get your C Hook Coil Handling Crane!
Category: 15 Ton Overhead Crane for Sale
Your Trusted Overhead Crane Manufacturer & Supplier
This case study shares a real project we completed for a steel mill in Pakistan. It focuses on a 15-ton overhead crane equipped with a C-hook, specially designed for coil handling.
Customized for Steel Coil Handling
The client needed a solution to lift and move heavy steel coils efficiently. We supplied a European-style double girder overhead crane, paired with an electric hoist trolley and a custom C-hook. The design was fine-tuned for:
This crane was not just off-the-shelf—it was engineered to meet the client's specific workshop layout and lifting needs.
What You'll See in This Case
This project wasn't just about building a crane—it was about solving real challenges for a steel mill. In this case study, we'll walk you through:
If you're looking for a proven steel mill crane solution for handling coils, this story gives you a clear picture of what to expect—from design to delivery and real operation.
We partnered with a steel mill in Pakistan to deliver a customized 15-ton overhead crane solution. The project focused on improving coil handling using a C-hook, tailored to meet the daily demands of heavy-duty steel production.
Project Details at a Glance
Key Objectives
We worked closely with the client to meet three main goals:
This project reflects our commitment to providing tailored solutions for steel mills with demanding coil handling needs.
This 15-ton overhead crane was built with both performance and safety in mind. It's designed specifically for steel coil handling in a challenging mill environment.
European-Style Double Girder Design
C-Hook for Steel Coil Lifting
Heavy-Duty Crane Construction
High Safety Standards
This crane wasn't just built to lift—it was built to perform and protect in one of the toughest work environments.
This project followed a carefully planned timeline to ensure on-time delivery and consistent communication with the client. Each stage of production was tracked, documented, and shared with the buyer to keep everything transparent.
Order Date – September 24
The project officially began when the client from Pakistan placed the order for the 15-ton overhead crane.
Once approved, we moved into full-scale production.
Girder Box Welding – October 21
By this point, the main girder boxes were fully welded and assembled.
This phase was critical to establishing the load-bearing performance of the steel mill crane.
Paint Spraying – October 31
After all steel structures were fabricated, we moved to surface treatment and painting.
This not only provided visual proof of progress but also allowed the client to verify the quality before shipment.
Shipment Details – November 7
After the final inspection and assembly checks were completed, we prepared the crane components for shipping.
Each step of the production and delivery timeline was documented and shared. This kept the client confident that the crane would be delivered on time and ready for installation.
We received an on-site video from the client, recorded inside their steel mill in Pakistan. The main focus of the footage is the working performance of the 15-ton C-hook overhead crane during actual production.
The video provides a close-up look at how the C-hook attachment is used to lift and move steel coils efficiently. It captures several crane operations from different angles, showing the smooth motion of the electric hoist trolley and the crane's overall stability.
Key scenes featured in the video:
What the Video Tells Us
From the footage, several performance highlights are clear:
The video effectively demonstrates how the crane fits into the daily workflow of a steel mill. It also validates that the coil handling solution we delivered performs as expected under real working conditions.
Here's a more detailed and natural rewrite of Section 5: Client Feedback & Results, using short, clear sentences and a practical tone. It follows your structure, includes added value, and ties back to the use of the 15-ton steel mill crane with a C-hook:
After installation and several weeks of continuous operation, the client shared strong, positive feedback on the performance of their 15-ton overhead crane. The focus was on real operational results—not just initial impressions.
What the Client Said
The steel mill team reported noticeable improvements in daily work. Here are the highlights of their feedback:
Increased Efficiency
Reliable Day-to-Day Performance
Safety on the Floor Improved
Real Impact on Steel Mill Operations
These improvements had a ripple effect across production:
What the Photos and Videos Show
The visual feedback backed up their comments:
These results confirm that the customized crane delivered exactly what the client needed: reliable, safe, and efficient coil handling built for steel mill use.
A Day in the Life of a Steel Mill
The 15-ton overhead crane plays a key role in the day-to-day operations of the steel mill, especially when it comes to handling steel coils. Let's break down the typical day and the crane's vital contributions.
Coil Handling Efficiency
Harsh Working Environment
Crane's Role in the Production Line
Steel Mill Workflow
The steel mill produces a wide variety of steel products, all of which need to be handled, processed, and transported within the plant.
This inside look into the steel mill operations demonstrates how crucial the overhead crane is to the daily workings of the facility. With its reliable performance in challenging environments, it supports the mill's ongoing efforts to maintain high output and efficiency.
Customization for Coil Handling
The client's main goal was to improve steel coil handling, which is the core of their production line. To meet these specific needs:
European Design Standards
The crane's design adheres to European engineering standards, ensuring top-tier performance in challenging environments like steel mills. The benefits include:
Long Service Life
In a high-demand, high-temperature steel mill, equipment has to withstand a lot of wear and tear. The 15-ton overhead crane was designed to:
Proven Track Record
This crane was chosen not only for its tailored design and European standards but also for our proven success in delivering reliable overhead crane systems. Key factors included:
This section highlights why this 15-ton overhead crane was the best choice for the client's steel mill and how it directly addresses their specific operational needs. Let me know if you'd like further details or adjustments!
When Is a C-Hook Crane Best for Steel Coil Handling vs. When It's Not Recommended?
C-Hook cranes are commonly used in steel mills and industrial settings to handle steel coils, particularly those that are horizontally eyed. These cranes are designed for the secure lifting and transportation of cylindrical coils, which are loaded onto the hook through their center eye. However, there are specific conditions under which the C-Hook crane is an excellent choice, as well as situations where it may not be ideal.
In this section, we'll examine the scenarios where a C-Hook crane is best suited for steel coil handling, specifically for horizontally eyed steel coils, and when it may not be recommended for use. This comparison will help you select the right crane based on your operational needs and environment.
Comparison Table: When a C-Hook Crane Is Best for Steel Coil Handling
Criteria | When C-Hook Crane Is Best for Steel Coil Handling |
---|---|
Load Type | Best suited for horizontally eyed steel coils, typically ranging from 5 to 30 tons. |
Frequency of Use | Ideal for high-frequency, repetitive coil handling operations. |
Coil Shape and Size | Perfect for cylindrical, horizontally eyed steel coils of standard sizes. |
Environmental Conditions | Suitable for typical steel mill environments, including dusty and moderately heated areas. |
Precision | Offers secure and stable lifting, with adequate precision for steel coils. |
Handling Speed | Well-suited for steady-paced operations requiring consistent lifting and transport. |
Space Requirements | Works efficiently in steel mills with sufficient overhead clearance. |
Safety | Improves safety by securely gripping the coil and reducing the risk of slippage. |
Load Protection | Prevents damage to coils by providing secure and stable lifting. |
Maintenance and Durability | Designed for heavy-duty use, ensuring long-term reliability in steel mills. |
Comparison Table: When a C-Hook Crane Is Not Recommended for Steel Coil Handling
Criteria | When C-Hook Crane Is Not Recommended for Steel Coil Handling |
---|---|
Load Type | Not ideal for smaller or irregularly shaped coils, such as flat or vertically eyed coils. |
Frequency of Use | Not suitable for low-frequency or occasional coil handling operations. |
Coil Shape and Size | Not designed for non-cylindrical coils or coils with irregular shapes. |
Environmental Conditions | Unsuitable for extremely harsh conditions, such as high heat or corrosive environments. |
Precision | Less precise for handling delicate or fragile steel coils. |
Handling Speed | Not recommended for fast-paced, high-speed lifting operations. |
Space Requirements | Not ideal for low-ceiling spaces or areas with limited overhead clearance. |
Safety | May not offer sufficient control when handling more delicate or sensitive loads. |
Load Protection | Higher risk of coil damage when lifting sensitive or fragile steel coils. |
Maintenance and Durability | Not recommended for light-duty or low-speed environments, as it may wear out quickly. |
This comparison helps clarify when a C-Hook crane is the best option for handling horizontally eyed steel coils and when it may not be suitable for certain operational environments. By evaluating these factors, you can make a more informed decision when selecting the right crane for your steel mill's specific needs.
Key Takeaways:
If you're looking to upgrade your steel mill operations, consider a 15-ton overhead crane for your coil handling needs. Yuantai Crane specializes in providing customized crane solutions that are tailored to your unique requirements. We can help enhance your operational efficiency, reduce downtime, and improve safety in your facility.
Contact Us Today: Whether you're in need of a steel mill crane or coil handling solutions, We, EOTCRANE Factory has the equipment and expertise you need. Our team is ready to discuss your project and offer a customized solution that fits your requirements.Get in Touch: Reach out now to find the perfect overhead crane for your operations. We're here to help you take your steel mill operations to the next level!
Supplied three grab bucket crane kits to Indonesia, enhancing garbage handling efficiency with high load capacity and reliable performance.
Free consultation to Confirm Parameters & Specifications and Get
Latest Crane Price & Crane Rate.
Just leave a message via the contact form and our hoist and crane engineer will contact you with in 24working hours.
Get In Touch